Weight Out, Not Cube Out: the Load Plan Is an Axle Plan
Crushed stone, sand and gravel run somewhere around a ton and a half per loose cubic yard.
Read it in full in the guide
Your material is bought by the ton and measured in cycles, not in shipments. Aggregate and concentrate reach the legal axle limit with the trailer barely a third full, and the last stretch of the route is a private haul road with a gate, a scale and a safety induction on it. We coordinate flatbed, spread axle, container, hazmat and permitted freight around that reality.
In short
Deck space is almost never the constraint. A load of crushed stone, sand or mineral concentrate hits the legal limit on an axle group with most of the deck still empty, so the conversation is density, axle configuration, load placement and what the certified scale says, not how many pallets fit. And the origin or the destination is usually not an address. It is a pit or a mine at the end of a private haul road, with an inbound scale for tare, an outbound scale for gross, a mandatory site induction, hazard training before a driver steps out of the cab and sometimes an escort across the property. All of that is cycle time, and none of it shows on a map. Material bought per delivered ton is priced out of turns per truck per day, so the minutes at the gate are part of the freight cost.
The cargo
What decides the load
The gist of each one here. The shipping guide has every one in full.
Crushed stone, sand and gravel run somewhere around a ton and a half per loose cubic yard.
Read it in full in the guideThe route to a pit or a mine ends where the public road does. After that comes a guard shack, a private haul road, an inbound scale for tare weight, an outbound scale for gross, and a scale house that prints the ticket the whole transaction settles on.
Read it in full in the guideAn open load of aggregate loses its fines to the wind and throws stone at whatever is behind it.
Read it in full in the guideConcentrated weight punches decks. A mill liner set, a crusher mantle or a concave puts five figures of cast steel on a footprint the size of a pallet, and a trailer deck rated in pounds per linear foot fails locally long before the load is illegal on the gross.
Read it in full in the guideAggregate demand is not set by the quarry. It is set by the construction calendar and by public works: paving seasons that close in the cold, agency letting schedules, fiscal year money that has to be spent, and a hot mix plant or a concrete pour that consumes exactly as fast as trucks arrive and stops when they do not.
Read it in full in the guideDobie coordinates transportation: a vetted carrier network managed by dedicated logistics specialists.
Read it in full in the guide
The numbers
Who this is for
The process
Not just an origin and a destination. What the material is and roughly what it weighs per yard or per bag, tons per load and tons per day or per month, the pit or mine and the receiving plant, the hours of both, and whether this is one move or a running program. Density and cycle set the equipment before anything else does.
Trailer and axle configuration selected for the density, load placement specified for the loader operator, permit class determined for anything over legal weight or dimension, and the route checked against bridge, weight and permitted travel restrictions rather than against drive time alone.
Training and induction requirements at both ends, PPE, gate and scale procedure, escort or radio protocol inside the property, the loading window against the gate hours, and how the ticket is issued. The driver arrives qualified to enter instead of turning around at the guard shack.
Authority, cargo insurance and equipment verified against this assignment on the day it dispatches. Weight and axle split confirmed on a certified scale, cover and condition documented at loading, and the scale ticket plus signed delivery paperwork returned, so the tons invoiced and the tons delivered are the same number.
Equipment
The modes this cargo actually uses, one page each.
Less volume than people expect and exactly as much weight as the axles allow. Crushed stone, sand and gravel run near a ton and a half per loose cubic yard, so a standard five axle truck reaches legal gross with roughly sixteen or seventeen yards on the deck. That is why quoting this cargo starts with the material and its density rather than with dimensions, and why the axle configuration and the load placement are part of the quote instead of a detail the driver sorts out at the pit.
Yes, and it is settled before the first load rather than at the gate. Tell us whether the operation runs under 30 CFR Part 46 or Part 48, what record the site keeps for a driver coming through, whether the induction can be completed online in advance or has to be done on site, what PPE is required, and whether a public road tractor needs an escort or a radio channel to cross the property. A driver who is not qualified to step out of the cab cannot be loaded, so that qualification is part of dispatch, not an afterthought.
Class 1 explosives are not a trailer question, they are a carrier qualification question, and the answer is confirmed with operations before anything is quoted. That cargo requires a carrier holding the specific authorization for it, drivers with a hazardous materials endorsement and the security threat assessment behind it, a security plan, placarding, and for the higher divisions a written route plan and attendance rules that keep the vehicle from ever being left unattended. Oxidizers such as ammonium nitrate and self heating flotation reagents are a separate classification question and get answered the same way. Send the proper shipping name, UN number and packing group and you will get a straight yes or no on your lane.
That is dedicated bulk equipment and it gets confirmed for your lane before it is quoted, never promised on a page. What the receiving end does with the material decides it: a silo that has to be blown into needs a pneumatic tanker with a blower and hose, a hopper pit needs a bottom dump, and a stockpile needs a dump body. Tell us the material and the receiving method and you get a real answer. Bulk in super sacks, palletized bagged material and containerized lots run on the coordinated network as a matter of course.
By deciding which dimension you are willing to permit. Stood upright, a large haul truck tire puts the load over legal height. Laid flat, it puts the load over legal width. Either way it is a permitted move, so the orientation is chosen against the route, not against what is convenient at the loading end. Deck height gets bought back with a step deck or an RGN, and the tire travels cradled or chocked and blocked front and rear, because a tire that begins to roll on a deck cannot be stopped by a strap alone.
Both, and the distinction matters for how it gets planned. Mining and aggregates is the sector, the thing your material and your site rules belong to. Oversized and project cargo are modalities, the way a particular piece travels. A single over width screen deck is an oversized move quoted as one permitted load. A full crushing spread or a plant expansion is project cargo: many pieces, a delivery sequence that matches the erection sequence, and a schedule where the wrong piece arriving first blocks the yard. A mine buys both from the same program, and the pages for each explain what changes.
By cycle, not by shipment. What a delivered ton costs comes out of how many turns a truck makes in a day, and that number is set as much by gate time, induction, scale queue and loading window as by highway miles. So a running program gets planned around turn time at both ends, and the pit scale ticket is what the tonnage reconciles against, which is why the ticket comes back with the signed paperwork rather than staying in a scale house.
The South Texas corridor is home territory for this team, and a northbound concentrate lot is planned as one schedule rather than as two separate moves. The paperwork is what most shippers underestimate: alongside the commercial documents, the lot's assay and its stated moisture content travel with it, because the value is settled on dry payable metal and the receiving side will check both. The customs broker's timing, the yard transfer and the handoff to the carrier on the other side all sit inside the delivery window instead of next to it.
Everything gets planned backward from the moment crews walk in. Liners, wear parts and tires have to be staged on the ground before the outage starts, sequenced in the order they get installed rather than delivered as one pile. If any piece needs an oversize permit, the schedule tightens further, because permitted travel is restricted by time of day and by day of week in much of the country, so a Monday morning start has to be built around the last hours permits will legally run on the Friday before.
Last reviewed: August 2026 · Reviewed by the Dobie Transport logistics team
A logistics specialist reviews your lanes and comes back with pricing and capacity. Support runs 24/7.
Every carrier is vetted for operating authority and insurance, and we check the certificate before every dispatch, not once a year. USDOT 3411782 · MC 1100274