USDOT 3411782MC 1100274
Heavy equipment loader parked on site
Industry

Mining and Aggregate Freight That Weighs Out Long Before It Cubes Out

Your material is bought by the ton and measured in cycles, not in shipments. Aggregate and concentrate reach the legal axle limit with the trailer barely a third full, and the last stretch of the route is a private haul road with a gate, a scale and a safety induction on it. We coordinate flatbed, spread axle, container, hazmat and permitted freight around that reality.

100k+
Loads Delivered
Nationwide
Carrier Network
6
Years in Business
50
States Covered
98%
On-Time Delivery

In short

What Makes Mining and Aggregate Freight Different?

Deck space is almost never the constraint. A load of crushed stone, sand or mineral concentrate hits the legal limit on an axle group with most of the deck still empty, so the conversation is density, axle configuration, load placement and what the certified scale says, not how many pallets fit. And the origin or the destination is usually not an address. It is a pit or a mine at the end of a private haul road, with an inbound scale for tare, an outbound scale for gross, a mandatory site induction, hazard training before a driver steps out of the cab and sometimes an escort across the property. All of that is cycle time, and none of it shows on a map. Material bought per delivered ton is priced out of turns per truck per day, so the minutes at the gate are part of the freight cost.

Crawler dozer secured on a lowboy trailer, seen from the rear

The cargo

What Mining and Aggregate Freight Actually Looks Like on the Trailer

  • Crushed aggregate, base rock, sand and gravel moving from the pit to a batch plant, a hot mix asphalt plant or a job site
  • Mineral concentrate and bulk ore in FIBC super sacks, one to two tons a bag, headed to a smelter, a processor or a port
  • Quicklime, hydrated lime, cement and soil or water treatment material, all of it moisture reactive and none of it forgiving of a leaky tarp
  • Crusher and mill wear parts: mantles, concaves, jaw plates, screen decks and mill liner sets, cast steel that weighs out on a footprint the size of a pallet
  • Grinding media, forged steel balls and rods in drums, bulk bags or loose in bins, consumed on a fixed curve by every mill that is running
  • Giant OTR tires and mounted wheel assemblies for haul trucks, loaders and dozers
  • Drill steel, bits, shanks, couplings and blasthole consumables restocking the mine warehouse against a shutdown date
  • Plant structure and pipe: conveyor sections and idler sets, cyclone clusters, thickener plate, chutes, slurry line and HDPE pipe
  • Flotation reagents, flocculant, lime for pH control and classified oxidizers such as ammonium nitrate, moving under their hazard classification rather than under a trailer type
  • Reclamation and closure material moving back out: scrap steel, worn liners, scrap tires and used conveyor belting

What decides the load

6 things a specialist works through before quoting

The gist of each one here. The shipping guide has every one in full.

Weight Out, Not Cube Out: the Load Plan Is an Axle Plan

Crushed stone, sand and gravel run somewhere around a ton and a half per loose cubic yard.

Read it in full in the guide

The Gate, the Scale and the Induction: Time That Never Shows on a Map

The route to a pit or a mine ends where the public road does. After that comes a guard shack, a private haul road, an inbound scale for tare weight, an outbound scale for gross, and a scale house that prints the ticket the whole transaction settles on.

Read it in full in the guide

Dust, Moisture and the Tarp Are Product Value, Not Housekeeping

An open load of aggregate loses its fines to the wind and throws stone at whatever is behind it.

Read it in full in the guide

How Mining Freight Fails in Transit, and What Prevents It

Concentrated weight punches decks. A mill liner set, a crusher mantle or a concave puts five figures of cast steel on a footprint the size of a pallet, and a trailer deck rated in pounds per linear foot fails locally long before the load is illegal on the gross.

Read it in full in the guide

The Paving Season Peaks and the Mill Never Stops

Aggregate demand is not set by the quarry. It is set by the construction calendar and by public works: paving seasons that close in the cold, agency letting schedules, fiscal year money that has to be spent, and a hot mix plant or a concrete pour that consumes exactly as fast as trucks arrive and stops when they do not.

Read it in full in the guide

Why Dobie Fits a Mine or a Quarry Freight Program

Dobie coordinates transportation: a vetted carrier network managed by dedicated logistics specialists.

Read it in full in the guide
Crawler dozer loaded on a lowboy trailer in a gravel yard

The numbers

Mining and Aggregate Requirements at a Glance

Weight and axles80,000 lb gross on the Interstate system, 20,000 lb on a single axle and 34,000 lb on a tandem, with the federal bridge formula tying each group to axle spacing
Weighing and ticketsCertified scale weight before departure, with the pit ticket showing tare, gross and net tons
Site accessMSHA site specific hazard awareness training, 30 CFR Part 46 at sand, gravel and surface stone operations and Part 48 underground and at most other metal and nonmetal mines, plus site induction, PPE and gate procedure
CoveringLoose material contained and covered so it cannot leak, spill or blow off, sealed at the leading edge, with bagged and moisture reactive material protected from water

See all 9 requirements →

Who this is for

Who This Page Is Written For

  • Purchasing and supply chain managers at surface and underground mines buying inbound consumables and moving product out
  • Quarry and plant managers at aggregate, sand and gravel operations selling delivered tons
  • Ready mix and hot mix asphalt producers whose plant runs only as long as material keeps arriving
  • Maintenance and reliability planners staging liners, wear parts and tires against a fixed shutdown window
  • Capital project and construction teams building a plant expansion or relocating a crushing spread
  • Concentrate traders and metal marketers moving lots from mine to smelter or to port on an assay settlement

The process

How a Mining or Aggregate Load Gets Coordinated

01

Send the material, the tonnage and the cycle

Not just an origin and a destination. What the material is and roughly what it weighs per yard or per bag, tons per load and tons per day or per month, the pit or mine and the receiving plant, the hours of both, and whether this is one move or a running program. Density and cycle set the equipment before anything else does.

02

The load plan is built as an axle plan

Trailer and axle configuration selected for the density, load placement specified for the loader operator, permit class determined for anything over legal weight or dimension, and the route checked against bridge, weight and permitted travel restrictions rather than against drive time alone.

03

Site rules confirmed before dispatch

Training and induction requirements at both ends, PPE, gate and scale procedure, escort or radio protocol inside the property, the loading window against the gate hours, and how the ticket is issued. The driver arrives qualified to enter instead of turning around at the guard shack.

04

Verified carrier, weighed load, ticket back with the POD

Authority, cargo insurance and equipment verified against this assignment on the day it dispatches. Weight and axle split confirmed on a certified scale, cover and condition documented at loading, and the scale ticket plus signed delivery paperwork returned, so the tons invoiced and the tons delivered are the same number.

Frequently Asked Questions

How much aggregate actually fits on a legal truck?

Less volume than people expect and exactly as much weight as the axles allow. Crushed stone, sand and gravel run near a ton and a half per loose cubic yard, so a standard five axle truck reaches legal gross with roughly sixteen or seventeen yards on the deck. That is why quoting this cargo starts with the material and its density rather than with dimensions, and why the axle configuration and the load placement are part of the quote instead of a detail the driver sorts out at the pit.

Our site requires MSHA site specific training and an induction before anyone enters. Can that be handled?

Yes, and it is settled before the first load rather than at the gate. Tell us whether the operation runs under 30 CFR Part 46 or Part 48, what record the site keeps for a driver coming through, whether the induction can be completed online in advance or has to be done on site, what PPE is required, and whether a public road tractor needs an escort or a radio channel to cross the property. A driver who is not qualified to step out of the cab cannot be loaded, so that qualification is part of dispatch, not an afterthought.

Can you move explosives or blasting agents?

Class 1 explosives are not a trailer question, they are a carrier qualification question, and the answer is confirmed with operations before anything is quoted. That cargo requires a carrier holding the specific authorization for it, drivers with a hazardous materials endorsement and the security threat assessment behind it, a security plan, placarding, and for the higher divisions a written route plan and attendance rules that keep the vehicle from ever being left unattended. Oxidizers such as ammonium nitrate and self heating flotation reagents are a separate classification question and get answered the same way. Send the proper shipping name, UN number and packing group and you will get a straight yes or no on your lane.

Do you provide end dumps, belly dumps or pneumatic tankers?

That is dedicated bulk equipment and it gets confirmed for your lane before it is quoted, never promised on a page. What the receiving end does with the material decides it: a silo that has to be blown into needs a pneumatic tanker with a blower and hose, a hopper pit needs a bottom dump, and a stockpile needs a dump body. Tell us the material and the receiving method and you get a real answer. Bulk in super sacks, palletized bagged material and containerized lots run on the coordinated network as a matter of course.

One tire weighs more than five tons and is taller than the trailer. How does it ship?

By deciding which dimension you are willing to permit. Stood upright, a large haul truck tire puts the load over legal height. Laid flat, it puts the load over legal width. Either way it is a permitted move, so the orientation is chosen against the route, not against what is convenient at the loading end. Deck height gets bought back with a step deck or an RGN, and the tire travels cradled or chocked and blocked front and rear, because a tire that begins to roll on a deck cannot be stopped by a strap alone.

Is a crusher relocation a mining job or a project cargo job?

Both, and the distinction matters for how it gets planned. Mining and aggregates is the sector, the thing your material and your site rules belong to. Oversized and project cargo are modalities, the way a particular piece travels. A single over width screen deck is an oversized move quoted as one permitted load. A full crushing spread or a plant expansion is project cargo: many pieces, a delivery sequence that matches the erection sequence, and a schedule where the wrong piece arriving first blocks the yard. A mine buys both from the same program, and the pages for each explain what changes.

We buy delivered tons. How does freight actually get measured on a running program?

By cycle, not by shipment. What a delivered ton costs comes out of how many turns a truck makes in a day, and that number is set as much by gate time, induction, scale queue and loading window as by highway miles. So a running program gets planned around turn time at both ends, and the pit scale ticket is what the tonnage reconciles against, which is why the ticket comes back with the signed paperwork rather than staying in a scale house.

Can concentrate move north out of a Mexican mine?

The South Texas corridor is home territory for this team, and a northbound concentrate lot is planned as one schedule rather than as two separate moves. The paperwork is what most shippers underestimate: alongside the commercial documents, the lot's assay and its stated moisture content travel with it, because the value is settled on dry payable metal and the receiving side will check both. The customs broker's timing, the yard transfer and the handoff to the carrier on the other side all sit inside the delivery window instead of next to it.

Our shutdown date cannot move. What changes for a shutdown delivery?

Everything gets planned backward from the moment crews walk in. Liners, wear parts and tires have to be staged on the ground before the outage starts, sequenced in the order they get installed rather than delivered as one pile. If any piece needs an oversize permit, the schedule tightens further, because permitted travel is restricted by time of day and by day of week in much of the country, so a Monday morning start has to be built around the last hours permits will legally run on the Friday before.

Last reviewed: August 2026 · Reviewed by the Dobie Transport logistics team

Ready to Ship?

Get a Free, No-Obligation Quote Today

A logistics specialist reviews your lanes and comes back with pricing and capacity. Support runs 24/7.

24/7 Support AvailableResponse in Under 10 MinutesNo Hidden Fees

Every carrier is vetted for operating authority and insurance, and we check the certificate before every dispatch, not once a year. USDOT 3411782 · MC 1100274