USDOT 3411782MC 1100274
Bundled steel pipe prepared for flatbed transport
Industry

Steel, Coil and Pipe Freight That Rides Legal on Every Scale

Metals hit the weight limit long before the deck is full, and where the weight sits decides whether the truck clears the first scale. We coordinate flatbed, step deck, RGN, stretch and heavy container capacity for coil, plate, structural, pipe and scrap, secured to the federal standard and tarped because wet steel is damaged steel.

100k+
Loads Delivered
Nationwide
Carrier Network
6
Years in Business
50
States Covered
98%
On-Time Delivery

In short

What Makes Metals and Steel Freight Different?

Metals freight is the load that reaches the legal weight limit before it fills the trailer, every single time. One hot rolled coil can weigh what a whole trailer of packaged goods weighs, and it concentrates that weight into a few feet of deck instead of spreading it across forty eight. So the question stops being how much fits and becomes where each piece sits, what keeps it from rolling and what holds it down. Federal securement rules pull metal coils out as their own commodity class, with a tiedown arrangement keyed to which way the eye is pointing. Steel starts oxidizing the moment water reaches it, pipe threads bruise if a chain lands in the wrong place, and a load that is legal on the gross scale can still be over on one axle group. All of that is decided at loading, not discovered at the destination.

Industrial piping running along a plant wall

The cargo

What Metals Freight Actually Looks Like on the Deck

  • Hot rolled coil, pickled and oiled, riding in a cradle with the eye crosswise or lengthwise
  • Cold rolled, galvanized and prepainted coil where the surface is the product and a water stain is a rejection
  • Plate and sheet in lifts, full mill plate and cut to size orders bound for a fabricator
  • Structural shapes: wide flange beams, channel, angle and HSS tube going to a steel erector or a metal building plant
  • Rebar bundles, welded wire mesh and dowel baskets delivered to a jobsite with no dock and no forklift
  • Bar stock, billets and wire rod coils moving mill to processor
  • Line pipe, casing and tubing with thread protectors on both ends, plus drill pipe out of a pipe yard
  • Scrap and recycled metal: bales, shred, prepared heavy melt and turnings moving to a mill or an export dock
  • Aluminum and non-ferrous: extrusions, ingot, coil stock, copper cathode and wire
  • Overweight containers of coil and pipe pulled off a port or a rail ramp

What decides the load

6 things a specialist works through before quoting

The gist of each one here. The shipping guide has every one in full.

Metals Weigh Out Before They Cube Out

A tractor and a flatbed leave you somewhere in the mid forty thousands of pounds of legal payload against the 80,000 pound interstate gross limit.

Read it in full in the guide

Coils Have Their Own Rule in the Federal Securement Standard

The federal cargo securement rules carve metal coils out as a separate commodity with their own requirements once the coil or the group weighs 5,000 pounds or more.

Read it in full in the guide

Pipe, Structural and Bundles: Rolling, Threads and Length

Pipe is the other cargo on this list that rolls, and the rule for anything likely to roll is the same: chocks, wedges, a cradle or an equivalent that removes the movement rather than resisting it.

Read it in full in the guide

Rust Is Cargo Damage, and the Tarp Is Product Protection

Tarping a steel load is not about how the truck looks. Bare steel starts oxidizing the moment water reaches it, and on cold rolled, galvanized or prepainted coil the surface is the product.

Read it in full in the guide

How a Metals Load Fails in Transit, and What Prevents It

The catastrophic failure is a coil that breaks loose. Nothing on a trailer absorbs that much mass in one lump, and a coil that gets moving in a hard stop goes through the headache rack.

Read it in full in the guide

Why Dobie Fits Metals, Steel and Pipe Freight

Dobie coordinates transportation: a vetted carrier network managed by dedicated logistics specialists.

Read it in full in the guide
Tarped flatbed load secured for transport

The numbers

Metals Freight Requirements at a Glance

Weight and axle distribution80,000 pound interstate gross, 20,000 on a single axle, 34,000 on a tandem group, bridge formula spacing, plus state rules like a kingpin to rear axle limit
Coil securementMetal coils are their own commodity class in the federal securement rules once the coil or group reaches 5,000 pounds
Tiedown capacityAggregate working load limit of at least half the article weight, with chain on steel and edge protection where a tiedown crosses a corner
Re-securementInspection and re-tension inside the first fifty miles, then at set intervals through the trip

See all 9 requirements →

Who this is for

Who This Page Is Written For

  • Traffic and logistics managers at mills and processors shipping coil, plate and bar to service centers
  • Service center dispatchers turning inbound coil into cut to size and slit orders on a daily schedule
  • Purchasing and shipping managers at steel fabricators, metal building plants and rebar shops
  • Pipe and OCTG distributors moving casing, tubing and line pipe between yards and pad sites
  • Scrap dealers and recyclers hauling prepared grades to consuming mills and export docks
  • Aluminum extruders and non-ferrous distributors shipping product that cannot take a chain mark

The process

How a Metals Load Gets Coordinated

01

Send the piece list, not just the tonnage

Weight and dimensions per coil, bundle or lift, the coil eye orientation you load in, whether the product is surface critical, the tarp requirement, and the pickup and delivery facilities. A total tonnage number is not enough to build a legal load plan from.

02

The load plan is built to the axles

Positions assigned so the tandems, the drives and the steer all sit inside their limits, not just the gross. Trailer chosen from the piece: flatbed for standard coil and structural, step deck for height, stretch for length, RGN for what neither of those can take, container and drayage for import and export moves.

03

Carrier assigned and verified the day of dispatch

Authority, cargo insurance and equipment checked against this load, including the coil package, the chain and working load limit against the piece weights, and steel tarps on board. Mill site rules, crane hours and driver PPE are confirmed with the driver before the truck is at the gate.

04

Tracked through the scales to the unload

Status through transit, re-securement handled at the required intervals, condition documented at pickup and at delivery, and signed paperwork with weight tickets and mill certs returned with the POD, which is the evidence a rust or handling claim is argued from.

Frequently Asked Questions

Can you move a single coil, or does it have to be a full deck?

A single coil is often already a truckload. Once one piece runs into the tens of thousands of pounds, the deck weighs out with one or two coils on it, so a load that looks half empty is a full truck by law. What we need to price and plan it is the coil weight, the outside and inside diameter, the width, the eye orientation you want it loaded in, and whether it has to be tarped.

How is a coil secured, and does the eye orientation change anything?

It changes everything. Metal coils get their own section of the federal securement rules once the coil or the group weighs 5,000 pounds or more, and the required arrangement depends on whether the eye is lengthwise, crosswise or vertical. Eyes lengthwise take tiedowns through the eye arranged to restrain forward and rearward movement, with blocking where the rule calls for it. Eyes vertical take tiedowns criss-crossed through the eye plus a tiedown over the top. In every orientation the coil sits in a rack, a purpose built cradle or timbers and chocks positioned so rolling is not physically possible, and the driver inspects and re-tensions inside the first fifty miles once the load beds into the dunnage. Tell us the orientation at booking, because a truck rigged for eyes crosswise is not automatically rigged for eyes vertical.

Do you tarp steel, and why does it matter if the product is going to be processed anyway?

Yes, and it matters because water damage on steel is permanent, not cosmetic. Moisture that reaches between the wraps of a coil stains inward, galvanized picks up wet storage stain when moisture sits against zinc with no airflow, and a receiver buying material for an exposed or coated application downgrades or rejects it rather than reworking it. Tell us at booking that the load tarps, and steel tarps and the time to install them are part of the assignment instead of an argument at the mill gate.

Our pipe is longer than a fifty three foot trailer. What are the options?

Short overhang past the deck is legal in most states with the projection flagged and marked, and there is a limit to how far that goes. Beyond it the joint moves on a stretch or extendable trailer under permit, with the route checked ahead of the truck for turns, bridges and restrictions. Send us the actual joint length, the outside diameter, the joint count and the weight, and the answer comes back as a specific trailer and permit plan for those states, not a maybe.

Can you deliver rebar or structural steel to a jobsite that has no forklift?

Yes, but the unloading method is decided before dispatch, not at the gate. A jobsite delivery means confirming what lifting equipment is on site and who operates it, whether the ground supports a truck with a loaded deck, whether the site can take a fifty three foot trailer at all, and what the delivery window is against the crew's schedule. Bundles of rebar and mesh also need to come off in the order the crew places them, so load sequence is planned in reverse from the unload.

What paperwork travels with a metals load?

More than most freight. The bill of lading carries piece counts and piece weights, heat numbers and mill test reports stay attached to the material so the product keeps its traceability, scrap moves against a certified scale ticket at both ends, and imported steel carries the country of melt and pour into its entry paperwork. Metal that loses its identification does not lose its value on the road, it loses it at the receiver, where a bundle nobody can trace to a heat cannot be used on a certified job.

We import coil and pipe from Mexico. Can you handle the crossing?

Yes, and it is home territory. Northeastern Mexico is a steel and pipe corridor and the South Texas crossings are weekly business here, including the customs brokers, the maneuvering yards and the carriers on the Mexican side. The two things that decide a metals crossing are the paperwork staying with the material and the weight plan working on both sides of the line, because axle and gross rules are not identical, so the load is built for the leg that is strictest rather than restacked at the border.

Who is responsible if the load comes up overweight on an axle?

The citation lands on the driver and the carrier, which is exactly why the prevention is upstream of both. Weight distribution is planned from the piece list before the crane picks the first coil, positions are assigned rather than left to the loader, and the trailer tandems are set for the route including states with their own kingpin to rear axle limits. Give us weight per piece instead of total tonnage and this is a non-event. Without piece weights nobody can build a legal load plan, they can only hope.

Do you handle scrap and non-ferrous, or only prime mill product?

Both, and they run differently. Scrap is a weight and ticket business: prepared grades load to a target weight, the load is weighed on a certified scale at both ends, and the buyer's ticket is what settles the transaction, so the scale your receiver accepts gets confirmed before the truck rolls. Copper and aluminum are a security question instead, because they resell by weight with no serial number to trace. Those loads get a recorded seal, no unsecured stop in the first hours out of the shipper, and cargo coverage limits reviewed against the value sitting on the deck.

Last reviewed: August 2026 · Reviewed by the Dobie Transport logistics team

Ready to Ship?

Get a Free, No-Obligation Quote Today

A logistics specialist reviews your lanes and comes back with pricing and capacity. Support runs 24/7.

24/7 Support AvailableResponse in Under 10 MinutesNo Hidden Fees

Every carrier is vetted for operating authority and insurance, and we check the certificate before every dispatch, not once a year. USDOT 3411782 · MC 1100274