USDOT 3411782MC 1100274
Step deck trailer en route on an open highway
Industry

Events & Entertainment Freight Requirements

Every show publishes its own exhibitor service manual. These are the fields that decide whether the freight makes the floor.

Specifications

Show Freight Requirements at a Glance

Every show publishes its own exhibitor service manual. These are the fields that decide whether the freight makes the floor.

RequirementThe specificationWhat it means for the load
Delivery windowAdvance warehouse receiving from about thirty days out, closing several business days before move-in, or a targeted show site date and hour for direct deliveryEarly arrivals are refused and late arrivals miss the show entirely, so the pickup is scheduled backward from the target hour
Check-inOff site marshalling yard check-in and sequencing at most large venues before a truck is called to the dockYard time burns the driver's 14 hour on duty clock, so he has to arrive with hours left to wait and still work the dock
DocumentationShow labels on every piece with show name, exhibitor, booth number and piece count, certified weight ticket for direct to site, outbound material handling agreement at the service deskFreight is matched to a booth by label, drayage is billed against the weight ticket, and the outbound BOL controls the return leg
UnloadingThe official contractor's labor holds exclusive jurisdiction at the dock and to the booth, billed as material handling by hundredweight against a minimumThe driver hands off at the tailgate, so your install crew or general contractor has to be there when he does
Move-outEmpty crates return in the order the floor is worked, and the outbound carrier must check in before the published deadline or the shipment is force-freightedThe return truck is booked and named with the inbound leg, with the driver staged near the venue instead of driving in that morning
HandlingRolling road cases strapped and decked so nothing rolls, aggregate tiedown working load limit at least half the cargo weight, crates stacked only as the builder rated them, graphics flat or upright as built and never used as a deckCasters, crush and cosmetic damage are the three ways this cargo dies, and all three are load-plan problems
EquipmentDry van with e-track and load bars as the baseline, air ride for consoles and LED, liftgate or ramp where there is no dock, straight truck where a 53 foot trailer cannot reach the loading areaVenue dock height, ramp clearance and street access decide the truck before the freight does
TemperatureMost show freight rides ambient, but refrigerated food and beverage samples, some cosmetic and gel samples, and adhesives and laminated prints all have limitsTemperature controlled equipment is assigned when the product calls for it, and cold gear is scheduled with time to acclimate before it is powered up
Regulated itemsPyrotechnics, compressed gas cylinders, larger lithium battery packs, generator sets with fuel, dry ice and shop chemicals each carry their own shipping rulesDeclared at booking so equipment, paperwork and carrier authority match the load instead of being sorted out at the dock
SecuritySeal number recorded at loading, no unsecured stop in the first hours out of the shop for high value AV, team drivers where value and calendar justify itCameras, lenses, wireless and LED resell fast, and a replacement cannot be sourced inside a move-in window

The equipment

The Venue Picks the Truck Before the Freight Does

Show freight is equipment driven at both ends. A crated booth leaves the exhibit house on a forklift and arrives at a loading dock, so a dry van with e-track and load bars covers it. A case pack going into a hotel ballroom, a museum atrium or a downtown pop-up meets a curb instead, which means a liftgate or a ramp and often a straight truck, because low garage clearances and underground loading areas stop a 53 foot trailer at the entrance. Consoles, LED tiles and control racks ride better on air ride, and freight that has to arrive presentable rides partial instead of LTL so it is not restacked by a forklift operator at a breakbulk dock at two in the morning. Truss, stage decking and power distribution are heavier, dirtier freight that sometimes wants an open deck. Two situations stop being a sector question and become a mode question. A piece that breaks legal width, height or weight travels as an oversized load, with permits, route planning and escorts where the states require them. A full arena build or a festival site that moves as a sequence of trailers in a fixed arrival order, with lift equipment waiting, is coordinated as project cargo. This page is the sector; those two are the modes, and a busy season usually needs both at some point. The dock, the clearance and the case list decide the equipment. Then the price.

Ready to Ship?

Get a Free, No-Obligation Quote Today

A logistics specialist reviews your lanes and comes back with pricing and capacity. Support runs 24/7.

24/7 Support AvailableResponse in Under 10 MinutesNo Hidden Fees

Every carrier is vetted for operating authority and insurance, and we check the certificate before every dispatch, not once a year. USDOT 3411782 · MC 1100274